<html>
  <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    Dear Tech, <br>
    Due to the short notice and complexity of the changes on Tuesday not
    all planned tasks have been completed. As a result further
    maintenance will be carried out on Saturday the 28th of April by
    [FVP] and myself, [CFE]. <br>
    <br>
    Yesterday's maintenance consisted most of laying the groundwork for
    later changes, with notable actions being:<br>
        - Adapting ucc-fw to allow the LAN port to be easily changed.<br>
        - Creating an updated /etc/networks/interfaces file to configure
    murasoi's 10G link.<br>
        - Configuring port 1 on walnut as a trunk port.<br>
    <br>
    These changes have been made in preparation for the planned
    maintenance on Saturday. Our plans are as follows:<br>
        - Install a 10G NIC in molmol.<br>
        - Reconfigure murasoi to use its 10G link as the primary LAN
    interface.<br>
    <br>
    Due to these changes molmol and murasoi are expected to be
    momentarily inoperable, which will lead to one or more total service
    outages that will affect UCC services including irc and terminal
    access. We apologies for any inconvenience that this may cause.<br>
    <br>
    Regards,<br>
    Zack Wong [CFE]<br>
  </body>
</html>