[committee] Fwd: Guild Village - Computer Club Room Requirements
Mark Tearle
mtearle at ucc.asn.au
Fri Jul 5 06:03:24 AWST 2019
And inevitably after sending the email ...
Security film on all glazing
Mark
--
Mark Tearle <mtearle at ucc.asn.au>
On Thu, 4 Jul 2019, at 11:00 PM, Mark Tearle wrote:
> A couple of extra items occurred to me ....
>
>
> Projects Workbench
>
> 4 off Double GPO
> 2 off Dual Cat6A
> Earth Bonding Point
> Task lighting
>
>
> Mark
>
> --
> Mark Tearle <mtearle at ucc.asn.au>
>
>
> On Thu, 4 Jul 2019, at 4:30 PM, Mark Tearle wrote:
>> Hi Felix, et al
>>
>> Here's my very quick thoughts as a starting point for a brief (I may have thought about this on and off for a couple of years). For clubroom size, they should be able to pick it up off of their existing drawings. May need to know the server room size though.
>>
>> More than happy to review drawings if the project gets legs ...
>>
>> Mark
>>
>>
>> UCC Clubroom Requirements
>>
>> Club Room
>> General
>> Natural light
>> Shade and blackout blinds
>>
>> Carpet
>>
>> Whiteboards
>> Noticeboards
>> Workstations
>> 11 off minimum (match existing)
>> Chairs (Relocate?)
>> Fixing point for security cables
>> Benches
>> Double GPO per workstation (above bench)
>> Addition Double GPO per every three workstations (above bench)
>> Seperate circuit per every three workstations (above bench)
>> Dual Cat6A data to each workstation (above bench)
>>
>> Couches
>> 2 off (match existing clubroom) (Relocate?)
>>
>> Telephone
>> Allow to relocate
>> Wall outlet, near door
>> Appropriate outlet and cabling
>>
>> AV
>> Projector (Relocate?)
>> Screen (Relocate?)
>> Projector Mount and Cabling, power outlet
>> Speaker/Audio cabling?
>>
>> Server Room
>> General
>> Anti-static vinyl flooring
>> Glazed windows / door to room
>>
>> Racks / Cabinets
>> 1 off Comms, 2 off Server
>> Panduit R4PCN (if open frame racks used)
>> Vertical Cable Management
>>
>> HVAC
>> Minimum 6kW cooling capacity (verify further)
>> Chilled water FCU similar to existing Guild Comms Room 1st Floor
>> Temperature and Humidity monitoring to UWA BMS
>> Communications
>>
>> 12 core G.652.D SMOF to UWA IT Comms Room
>> All Cat6A in clubroom back to Comms Rack in Server Room
>> Label per UWA Standard
>> Power
>> 2 15A supplies per rack/cabinet on dedicated circuits
>> Provide suitable PDU for each supply
>>
>> Location TBC
>> Printer
>> Dual Cat6A
>> Double GPO
>>
>> Coke Vending Machine
>> Arrange for relocation
>> Dual Cat6A
>> Single GPO Dedicated Circuit
>> Snack Vending Machine
>> Arrange for relocation
>> Dual Cat6A
>> Single GPO Dedicated Circuit
>> Digital Sign
>> Dual Cat6A
>> DoubleGPO
>> Webcams
>> Appropriate power/cabling
>> Wireless Network
>>
>> UWA UniFI AP and appropriate cabling
>>
>> Webcams
>> Appropriate power/cabling
>>
>> Storage and Shelving
>> Capacity similar to existing
>> Bookshelf
>> Capacity similar to existing
>>
>>
>> Other
>> Security
>>
>> Cardax to Clubroom and Server Room doors
>> Dry contact interface to trigger door open on Clubroom / Server Room doors
>>
>> Cardax access to building
>>
>>
>> --
>>
>> Mark Tearle <mtearle at ucc.asn.au>
>>
>>
>> On Wed, 3 Jul 2019, at 8:43 AM, Felix von Perger wrote:
>>> ---------- Forwarded message ----------
>>> From: Jedd Van Wyk <jedd.vanwyk at uwa.edu.au>
>>> Date: 3 Jul. 2019 2:37 pm
>>> Subject: Guild Village - Computer Club Room Requirements
>>> To: frekk at ucc.asn.au
>>> Cc: Joseph Chan 19 <vp at guild.uwa.edu.au>
>>>
>>>> Hi Felix,
>>>> I am unsure if you are aware but the Guild is looking to re-purpose some rooms within the Guild Village for a variety of Guild Department/Clubs. I am assisting with the project management of these works and currently we are working through the design process.
>>>>
>>>> Joseph Chan has provided me with your contact details so that I can request some information from you regarding the Computer Clubs requirements. Therefore can you please provide me with:
>>>>
>>>>
>>>> - Equipment that would be installed in this room. If you could advise kind of server, number of desktop computer and number of laptops, any other equipment which would be in the room at once.
>>>>
>>>> - Any specific room requirements (data (number of ports), ventilation for server, dedicated cabinet or rack for server or is this relocatable from your current room)
>>>>
>>>> - Preference for natural light in room. Would you prefer a room with or without a window in it?
>>>>
>>>> - Current floor plan size
>>>>
>>>>
>>>> It would be greatly appreciated if you could get back to me within the next few days with this information.
>>>>
>>>> Thanks,
>>>> *Jedd Van Wyk*
>>>> *Project Manager*
>>>> Campus Management • Perth WA 6009 Australia
>>>> *M 0499 151 533* • *E jedd.vanwyk at uwa.edu.au*
>>>> The University of Western Australia <https://www.web.uwa.edu.au/university-campaigns-resources/emailsig2015/uwa-logo>
>>>> EZONE UWA Student Hub <https://www.uwa.edu.au/Facilities/EZONE> UWA on Facebook <http://www.uwa.edu.au/university-campaigns-resources/emailsig2015/facebook> UWA on Twitter <http://www.uwa.edu.au/university-campaigns-resources/emailsig2015/twitter> UWA on Youtube <http://www.uwa.edu.au/university-campaigns-resources/emailsig2015/youtube> UWA on Linked In <http://www.web.uwa.edu.au/university-campaigns-resources/emailsig2015/linkedin> UWA on Instagram <http://www.web.uwa.edu.au/university-campaigns-resources/emailsig2015/instagram>
>>>>
>>> _______________________________________________
>>> List Archives: http://lists.ucc.asn.au/pipermail/committee
>>
>> _______________________________________________
>> List Archives: http://lists.ucc.asn.au/pipermail/committee
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://lists.ucc.gu.uwa.edu.au/pipermail/committee/attachments/20190704/dc797a51/attachment-0001.htm
More information about the committee
mailing list