[tech] [wheel] UCC Status Update 25/3

Daniel J. Axtens danielax at gmail.com
Thu Mar 25 15:10:11 WST 2010


Wound up more cables; cleared some of the desk; including sweeping up
the glass. Thanks to [TPG], [SLX], matches and Adam.

Some carpet tiles were annoying me; they kept getting in the way when
moving the racks. So I pulled them up (11 in total). Hope this is OK;
AIUI we were writing it off anyway?

[DJA]

On 25 March 2010 14:50, Bob Adamson <bob at ucc.gu.uwa.edu.au> wrote:
> Machine Room:
> -roof has been unscrewed so that we can slide it to the side to get to the
> windows
> -security is a priority, so the roof will be left in place until the glazier
> arrives
> -would be awesome if we could design a new roof that is stronger and can be
> walked on
> -portable aircon is in there, set on dehumidify
> -any cables threaded through the roof frame have had to be taken down
> -we need someone with clue who can go through the stuff on the top shelf
>
> Clubroom
> -still not vacuumed, not likely to happen in the near future as the floor
> has MR stuff all over it
> -the carpet is dryish, and most people think it needs to be lifted so the
> floorboards underneath can dry. Comments?
> -got a window open today (I had boarded it up just right)
>
>
> Bob Adamson
> UCC Treasurer
>
> |"Bureaucracy is a challenge to the be conquered with a righteous        |
> |attitude, an intolerance for stupidity, and a bulldozer when necessary" |
> | ---Peter's Laws                                                        |
>
>