Here are the UCC's suggestions for the maintenance of Cameron Hall for the
short, medium and long term.
Short Term
- Unigames should be disconnected from circuit Red 1 and connected to a
low-load circuit in the Guild Communications Room, to prevent power
overload as circuit breakers will cut power to the UCC essential
services in our server room.
- UniSFA's leaking ceiling needs to be repaired.
- The high windows on both sides of Cameron Hall are currently jammed and
need to be fixed.
- The vandalism on the beams in the loft need to be painted over.
- Whirly-birds need to be installed in Cameron Hall to improve
ventilation.
- Hasp & Staple locks should be installed on all cupboards in Cameron
Hall. http://www.directa.co.uk/product_images/SP50L.jpg
- Repair the cupboard and sinks in the loft.
Medium Term
- The 3-phase socket outlet in the loft should be split to provide extra
circuits, or redistribute power circuits amongst clubs.
- The main stairwell in Cameron Hall needs to be recarpeted.
- New cupboards should be installed in the stairwell outside the old Solid
Gold clubroom.
- The large hole in the roof above the UCC clubroom needs to be fixed.
- Pest control.
Long Term
- Fix all holes in the walls and repaint Cameron Hall.
- Swipe card access to Cameron Hall for out of hours access.
Feel free to contact me at president at ucc.asn.au for any enquiries.