[committee] UCC Cameron Hall Maintenance Suggestions
Frames
oxinabox at ucc.asn.au
Tue Mar 19 12:28:27 WST 2013
Hi,
just a bit more information on this:
On 19/03/2013 12:09 PM, Samuel Shenton wrote:
> Unigames should be disconnected from circuit Red 1 and connected to a
> low-load circuit in the Guild Communications Room, to prevent power
> overload as circuit breakers will cut power to the UCC essential
> services in our server room.
It should be mentions that SOC/Tenency budgetted and approved for this
to be done, last year.
but by a mistake the Red 6 circuit was upgraded.
The Red 1 circuit is shared by UCC, Unigames, and (we think) Unisfa.
As a short term measure last year, Unigames put in the rather scary
looking "Flying extension cable", to get power from outside the clubroom.
> - Hasp & Staple locks should be installed on all cupboards in Cameron
> Hall. http://www.directa.co.uk/product_images/SP50L.jpg
I'll also mention that Unigames has taken to (over the last few years),
installing our own
sliding bolts on our cupboards.
The is a long term issue, that all the existing bolts on the left side
of the hall cupboards are designed to be used at the bottom, but are in
fact install on the top (so the bolt falls out under gravity).
A solid outside lock (such as a bolt, or a staple) makes the uselessness
of the one side door bolts a nonissue though
Regards
Frames
Unigames Immediate Past President
UCC Wheel member
On 19/03/2013 12:09 PM, Samuel Shenton wrote:
> Hi Maddie,
>
> Here are the UCC's suggestions for the maintenance of Cameron Hall for
> the short, medium and long term.
>
> Short Term
> - Unigames should be disconnected from circuit Red 1 and connected to a
> low-load circuit in the Guild Communications Room, to prevent power
> overload as circuit breakers will cut power to the UCC essential
> services in our server room.
> - UniSFA's leaking ceiling needs to be repaired.
> - The high windows on both sides of Cameron Hall are currently jammed and
> need to be fixed.
> - The vandalism on the beams in the loft need to be painted over.
> - Whirly-birds need to be installed in Cameron Hall to improve
> ventilation.
> - Hasp & Staple locks should be installed on all cupboards in Cameron
> Hall. http://www.directa.co.uk/product_images/SP50L.jpg
> - Repair the cupboard and sinks in the loft.
>
> Medium Term
> - The 3-phase socket outlet in the loft should be split to provide extra
> circuits, or redistribute power circuits amongst clubs.
> - The main stairwell in Cameron Hall needs to be recarpeted.
> - New cupboards should be installed in the stairwell outside the old
> Solid
> Gold clubroom.
> - The large hole in the roof above the UCC clubroom needs to be fixed.
> - Pest control.
>
> Long Term
> - Fix all holes in the walls and repaint Cameron Hall.
> - Swipe card access to Cameron Hall for out of hours access.
>
> Feel free to contact me at president at ucc.asn.au for any enquiries.
>
> Kind regards,
> Samuel Shenton
> UCC President 2013
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.ucc.gu.uwa.edu.au/mailman/private/committee/attachments/20130319/d3ce2176/attachment.htm
More information about the committee
mailing list