> A while ago Nick Bannon tapped:
> On Thu, Sep 02, 1999 at 03:25:17PM +0800, Simon Fryer wrote:
> [...]
> > > - Preparations for sensible power (tm)
> >
> > This will become an eventuality some day - but the people installing it are
> > likely to need a lot of access to the machien room. I forsee much uphevall
> > and downtime when the power is finally installed. I would also imagine
> > that the machine room will be reoptimised several times between now and then.
> [...]
>
> Well, there's a lot we could do towards it simply by Powerboard Overkill
> (tm). Neatly attach as many power sockets to each rack as there is
> space for power using devices. Add a couple for luck. Add a few more in
> sensible spots on the walls or hanging from the roof. Use the appropriate
> circuits to power each one and possibly do some actual measurements with
> a clamp meter.
And the Powerboard Overkill is different from current UCC setup in which way
exactly! :-)
About the clamp meter thingy... I think I put the power cable suitable for
a clamp meter on starfish. Has anyone actually measured the power consuption
yet?
> - Placement of the monitor switch and serial terminal(s)
And the serial console switch (I think that is what is it!)
- Securing of erwin to something solid so it is no longer in the machine
room.
- replacement of the network card in Manta
- reracking merman and debugging the serial problems with the new CPU card.
See Ya
Simon
--
------------------------------------------------------------------------
"Well, an engineer is not concerned with the truth; that is left to
philosophers and theologians: the prime concern of an engineer is
the utility of the final product."
Lectures on the Electrical Properties of Materials, L.Solymar, D.Walsh
More information about the tech
mailing list